Pollution Near ZIP 78380

ROBSTOWN, TX

184 facilities 60 violations $194,671 penalties
Facility Programs Grade Violations Penalties
US ECOLOGY
3277 CO RD 69
Air Water Waste F 15 $99,683
AGUA DULCE COMPRESSOR STATION
FROM THE INTX OF HWY 44 & RT 666 HEAD SOUTH ON RT
Air C 1 $69,300
ROBSTOWN WWTF
1250 N US HWY 77
Water F 11 $22,050
BTT EPIC FRAC
4399 FM 24
Air Water B 1 $3,638
PLT 43 AND PIT
4398 FM 1694
Water A 0 $0
ROBSTOWN AUTO PARTS & WRECKER
HWY 77 S
A 0 $0
USET BS 2
3277 COUNTY ROAD 69
Water A 0 $0
ROBSTOWN HARDWARE CO
831 LAREDO
Waste A 0 $0
HWY 44 AUTO PARTS
3241 S HWY 44
A 0 $0
ROBSTOWN UTILITY SYSTEMS
1100 N 4TH STREET
Air A 0 $0
NUECES COUNTY DEPT OF PUBLIC WORKS ROBSTOWN YARD
4540 FM 892
Water A 0 $0
POWERMATE BATTERY MFG CO
HIGHWAY 77 N
Waste A 0 $0
EL CENTRO LANDFILL
INTERSECTION CR 39 AND SR 69
Water A 0 $0
DAWKINS ON-SITE ROBSTOWN CBP1
3994 COUNTY ROAD 36
Water A 0 $0
P P M INC
4120 FM 1694
Waste A 0 $0
HALLIBURTION RESOURCE MANAGEMENT
HWY 77 S ROBSTOWN TX
Waste A 0 $0
ROBSTOWN ARMY RESERVE CONTROLLED HUMIDITY STORAGE FACILITY
501 N HWY 77
Water A 0 $0
BISHOP CISD WWTP
2391 CR 67
Water C 7 $0
ONEALS WELDING & FABRICATION
FM 624 4.5 MI W OF HIGHWAY 77
Waste A 0 $0
JENNINGS CHEVROLET CO
620 E MAIN
Waste A 0 $0
GARZA TRANSPORT
4536 WINCHESTER LN
Waste A 0 $0
FLORIDA GAS ROBSTOWN COMPRESSOR STATION
6 M S ON US 77 3 M S ON ST RD
Air A 0 $0
ROBSTOWN CONCRETE BATCH PLANT
APPROXIMATELY 0.50 MILE WEST OF THE INTERSECTION O
Water A 1 $0
ROBSTOWN FACILITY
4523 FM 892
Water A 0 $0
GFL PLANT SERVICES ROBSTOWN
2199 N US HIGHWAY 77
Water Waste B 2 $0
JARCO READY-MIX ROBSTOWN LOCATION
SOUTH ON 77 EXIT 2826 MAKE A RIGHT ON CR75 1/4 MIL
Water A 0 $0
SAFETY-KLEEN SYSTEMS
2203 TOWER STE A
Water Waste A 0 $0
AINSWORTH TRUCKING
4599 US HIGHWAY 77
Water Waste A 0 $0
WRIGHT MATERIALS BLUNTZER PLANT 3
5917 FM 3088
Water A 0 $0
WRIGHT MATERIALS NASON PLANT 1
5706 FM 3088
Water A 0 $0
ASHBERT ENVIRONMENTAL AND RECYCLE SERVICES
517 E MAIN ST
Waste A 0 $0
CALLICOATTE PIT
4090 CALLICOATTE ROAD
Water A 0 $0
KCS - SPEARS SIDING TRACK PROJECT
THE SIDING PROJECT IS LOCATED WITHIN THE KCS RIGHT
Water A 0 $0
VIOLET WATER SUPPLY
3051 HIGHWAY 44
Drinking-water B 0 $0
RAMIRO RODRIGUEZ
4469 COUNTY ROAD 91
Waste A 0 $0
ROBSTOWN FRACTIONATOR
A 0 $0
WIS ROBSTOWN
4127 COUNTY ROAD 34
Waste B 2 $0
ROBSTOWN LAUNDRY & DRY CLEANING
425 AVENUE B
Air A 0 $0
WAL-MART STORES INC
900 STATE HIGHWAY 44
Waste A 0 $0
WRIGHT MATERIALS
5706 FM 3088
Water A 0 $0
BORROW SOURCE 1CELL 51&52 CONSTRUCTION
3408 FM 892
Water A 0 $0
BLUNTZER CENTRAL PRODUCTION FACILITY
FROM THE INTERSECTION OF FM 624 AND HIGHWAY 77 TRA
Air A 0 $0
COMPRESSOR STATION 341
5 M W OF US 77 ON FM 624
Air A 0 $0
TESLA
FROM ROBSTOWN, TX HEAD SOUTH ON US77 FOR 3.4 MILES
Water A 0 $0
CALALLEN TO BANQUETE 69KV TRANSMISSION LINE REBUILD
CALALLEN SUBSTATION IS NEAR CALALLEN, TX, AT INTER
Water A 0 $0
ABSOLUTE INDUSTRIES
2932 CR 44
Waste A 0 $0
NUECES VACUUM SERVICE INCORPORATED
409 INDUSTRIAL AVE
Waste A 0 $0
CMI CC ROBSTOWN FACILITY
4523 FM 892 STE B
Water Waste A 0 $0
BTT EPIC FRAC
A 0 $0
ATLAS TUBULAR
1710 S HIGHWAY 77
Waste A 0 $0