Pollution Near ZIP 59743
MELROSE, MT
8 facilities
1 violations
$0 penalties
| Facility | Programs | Grade | Violations | Penalties |
|---|---|---|---|---|
|
THE HITCHING POST
446 MAIN STREET
|
A | 0 | $0 | |
|
BIG HOLE R - MELROSE BRIDGE
BRIDGE PROJECT
|
Water | A | 0 | $0 |
|
FEDERAL AID PROJECT IM 15-2(107)93 IRRIGATION CANAL RECONSTRUCTION
450 FT N OF MELROSE I-15 EXIT EXTENDING
|
Water | A | 0 | $0 |
|
MERIWETHER RANCH SUBDIVISION
MERIWETHER RANCH
|
Water | A | 0 | $0 |
|
BECKWITH CREEK PONY
PROJECT LOCATED 1 MILE EAST OF PONY ON SECONDARY 2
|
Water | A | 0 | $0 |
|
ANDERSON ENGINEERING INC - EVERIST RESIDENCE
AMENDED LOTS 32 33 34 MERIWETHER RANCH SUBDV
|
Water | A | 0 | $0 |
|
ANDY BAUGH - SILVER SPRING MINE
CAMP CREEK
|
Water | A | 0 | $0 |
|
SOLVAY - MAIDEN ROCK MINE
S1/2 NE1/4 NE1/4 T2S R9W S5
|
Waste | A | 1 | $0 |