Pollution Near ZIP 35442
ALICEVILLE, AL
58 facilities
52 violations
$13,685 penalties
| Facility | Programs | Grade | Violations | Penalties |
|---|---|---|---|---|
|
BR-0014(521) PS 1911
REPLACE BRIDGE ON SR-14 OVER LUBBUB CREEK BIN#0026
|
Water | A | 0 | $0 |
|
LAVENDER, INC.
1056 INDUSTRIAL DRIVE
|
Water | C | 12 | $0 |
|
BARRY'S BODY SHOP
103 1ST ST NW
|
Waste | A | 0 | $0 |
|
BUCHANAN HARDWOODS
600 BAPTIST LINE RD
|
Air Water Waste | A | 0 | $0 |
|
FCI ALICEVILLE FEDERAL BUREAU OF PRISONS
11070 HIGHWAY 14
|
Air Water | A | 0 | $0 |
|
STPAA-HSIP-0032(500) PS1869
RESURFACING AND 2 FT SAFETY WIDENING ON SR-32 FROM
|
Water | A | 0 | $0 |
|
STPAA-0014 (532) PS1389
SR-14 TO W OF JCT SR-86
|
Water | A | 0 | $0 |
|
JOHNSON TIMBER COMPANY
2100 INDUSTRIAL DRIVE
|
Water | A | 0 | $0 |